当前位置: 首页 > 党团工作 >

《南水北调与水利科技》:南水北调东线南四湖出、入湖泵站开启时间差分析研究(武周虎,罗辉,刘长余,孙丽凤,赵培青)(摘要)

发布时间:2022-02-22 15:13:39 | 来源:网友投稿
 

摘要:针对南水北调东线南四湖上、下级湖调水的出、入湖口提水泵站开启时间差计算确定问题,开展了调水出湖泵站开启的充要条件、开启时间和湖内水位升高速率等相关内容的研究。其成果表明出湖泵站开启在保证泵站引水渠进口水位下降控制不低于相应设计水位的充要条件是:入湖口提水泵站输水惯性波前锋到达出湖口,且入湖调蓄水量能满足输水流量形成恒定流水面线比降的楔形水体容积。同时,研究提出了出湖泵站开启时间、湖内水位升高速率和湖水位的计算公式以及相关图表,为工程设计和未来的调度运行管理奠定了理论基础。

关键词:南四湖;提水泵站;开启条件;开启时间;水位升高速率

中图分类号:TV68 文献标识码:A 文章编号:1672-1683(2008)01-0077-04

Start-up Time Difference of Pumping Station of Nansi Lake in the South-to-North Water Transfer

WU Zhou-hu1,LUO Hui2,LIU Chang-yu3,SUN Li-feng1,ZHAO Pei-qing3

((1.Qingdao Technological University,Qingdao 266033,China;2.Shandong Construction and Management Bureau of the South-to-North Water Diversion Project,Jinan 250013,China;3.Shandong Design Institute of Water Resources and Reconnaissance,Jinan 250013,China))

Abstract:By calculating start-up time difference of in-lake and out-lake pumping station in the upper and lower lakes,the article studies the necessary and sufficient conditions of start-up out-lake pumping station,the relationship between the start-up time of out-lake pumping station and rising velocity of lake water level.The necessary and sufficient conditions are the start-up of the out-lake pumping station does not cause the out-lake pumping station diversion channel import level to fall below the corresponding water level of the control and design conditions.The related conditions are the water begins to rise when the in-lake inertial wave reaches the lake exports;the water-holding capacity of the lake satisfies the water distribution current capacity to form the wedge-shaped water cubage of constant running water surface profile gradient,formula and tabulations of the pumping station start-up time.Rising velocity of the water level and lake water level for engineering design are also provided.

Key words:Nansi Lake;pumping station;start-up condition;start-up time;rising velocity of the water level

参考文献:

[1]武周虎,罗辉,刘长余,等.南水北调南四湖二维水流水质数值模拟与应用研究(总报告)[R].青岛:青岛理工大学,济南:山东省南水北调工程建设管理局、山东省水利勘测设计院,2005.

[2]麦赫默德(林秉南译).明渠不恒定流[M].北京:水利电力出版社,1987.156-187.

[3]武周虎,张宗孝,赵乃熊.安康水库洪水传播特性水槽试验研究[J].水利学报,1997,(5):7-14.

[4]宋月清,林仁.水泵起动过程中泵站湖泊水位降落值的分析[J].水利学报,1999,(5):22-26.

[5]付莎莎,武周虎.南水北调梁济运河段水流及排污混合区的数值模拟[A].黄真理.中国环境水力2004[C].北京:中国水利水电出版社,2004.29-33.

作者简介:武周虎(1959-)男,教授,主要从事水力学与水环境模拟方向的研究,公开发表学术论文60余篇。

来源:《南水北调与水利科技》2008年第1期

    

推荐访问:南水北调 泵站 东线 时间差 分析研究

版权声明:
1.十号范文网的资料来自互联网以及用户的投稿,用于非商业性学习目的免费阅览。
2.《《南水北调与水利科技》:南水北调东线南四湖出、入湖泵站开启时间差分析研究(武周虎,罗辉,刘长余,孙丽凤,赵培青)(摘要)》一文的著作权归原作者所有,仅供学习参考,转载或引用时请保留版权信息。
3.如果本网所转载内容不慎侵犯了您的权益,请联系我们,我们将会及时删除。

十号范文网 |
Copyright © 2018-2024 十号范文网 Inc. All Rights Reserved.十号范文网 版权所有
本站部分资源和信息来源于互联网,如有侵犯您的权益,请尽快联系我们进行处理,谢谢!备案号:粤ICP备18086540号