《南水北调与水利科技》:丹江口大坝加高工程施工期的度汛方式探讨(李志强,王从兵,康子军)(摘要)

发布时间:2022-02-25 15:07:12 | 来源:网友投稿
  摘要:南水北调中线工程是为了解决京、津、华北地区水资源紧缺而实施的战略性工程,丹江口大坝加高工程是中线工程的关键性工程之一。丹江口大坝初期工程在大坝加高施工期间仍然承担着汉江中下游防洪任务,妥善解决好丹江口大坝加高工程建设的顺利进行与初期工程的防汛度汛、正常运行管理关系,意义重大。现根据丹江口大坝加高工程施工期的度汛条件、度汛标准以及建设工期的要求等,对丹江口大坝加高施工期的度汛技术方案进行了探讨。

关键词:大坝;施工;度汛

中图分类号:TV642;TV521 文献标识码:B 文章编号:1672-1683(2008)01-0112-03

The Modes of Passing the Flood Season in the Construction Period of Dam Heightening Project in Danjiangkou

LI Zhi-qiang,WANG Cong-bing,KANG Zi-jun

(Mid-route Source of South-to-North Water Transfer Corp.Ltd,Danjiangkou 442700,China)

Abstract:The dam heightening project in Danjiangkou is one of key projects in the Middle Route of the South-to-North Water Transfer Project.During construction period,the Danjiangkou Dam still plays the role of flood control.Therefore,it is important to balance the dam heightening construction and flood control realization.According to the conditions and criterion of passing flood season and the construction period,the modes of passing the flood season are discussed.

Key words:Dam;construction,passing flood season

参考文献:

[1]丹江口水利枢纽大坝加高工程初步设计报告[R].武汉:长江水利委员会长江勘测规划设计研究院,2004.

作者简介:李志强(1969-)男,湖北浠水人,高级工程师,多年从事大型水利工程建设、运行管理工作

来源:《南水北调与水利科技》2008年第1期

    

推荐访问:丹江口 施工期 加高 南水北调 大坝

版权声明:
1.十号范文网的资料来自互联网以及用户的投稿,用于非商业性学习目的免费阅览。
2.《《南水北调与水利科技》:丹江口大坝加高工程施工期的度汛方式探讨(李志强,王从兵,康子军)(摘要)》一文的著作权归原作者所有,仅供学习参考,转载或引用时请保留版权信息。
3.如果本网所转载内容不慎侵犯了您的权益,请联系我们,我们将会及时删除。

十号范文网 |
Copyright © 2018-2024 十号范文网 Inc. All Rights Reserved.十号范文网 版权所有
本站部分资源和信息来源于互联网,如有侵犯您的权益,请尽快联系我们进行处理,谢谢!备案号:粤ICP备18086540号